Action (at last ?) on Bathing Water quality

WaterBriefing Newsletter of 26th September reports that work is soon to commence on a £40m project to improve the ailing water quality of the Bridlington coast.

This years heavy rainfall during the ‘bathing season’ has shown up the weaknesses of Combined Sewer Overflows (CSOsCSO The sewerage system generally carries surface water from rain falling on paved areas (roads, pavements, roofs, etc.) via a separate sewer from the sewer which carries foul water (sewage). Surface water sewers are generally low in contamination and are allowed to discharge direct to rivers and sea with no treatment, whereas foul sewers go to a sewage treatment works. When there is heavy or prolonged rainfall sewage treatment works may receive some of this rainwater and thus become overloaded. In these circumstances they need to overflow, discharging the overflow with little or no treatment. This overflow either goes direct to a river or the sea or, more commonly, into a surface water sewer which already connects with a river or the sea. This event, when a surface water sewer is compelled to accept poorly or untreated foul water, turns the surface water sewer into a combined sewer (surface and foul water) on account of the foul water sewer overflowing into it. When this happens the discharge from the surface water sewer is known as a ‘combined sewer overflow’.) and their inability to deal with the current situation brought about by climate change.

 


Please do share this

  • Facebook
  • Twitter
  • Delicious
  • StumbleUpon
  • Add to favorites
  • Email
  • RSS